
IQPI SIX SIGMA GREEN BELT BODY OF KNOWLEDGE
0.0 Basics
0.0 What is Quality?
0.1 What is Six Sigma?
0.2 How is Quality and Six Sigma Related?
0.3 What is Project Management?
0.4 How do I move as a Project Manager?
0.5 How do I merge Six Sigma & Project Management?
0.6 How do I select the project I should be working on?
1.0 Define Phase
1.1 Selecting my goal based on the project selection
1.1.1 Basic Six Sigma Metrics
1.1.1 Creating a Scope
1.2 Filling a Project Charter
2.0 Measure Phase
2.1 Thinking about the Process Photograph
2.1.1 Cause & Effect / Fishbone Diagrams
2.1.2 Process Mapping, SIPOC, Value Stream Map
2.1.3 X-Y Diagram
2.1.4 Failure Modes & Effects Analysis (FMEA)
2.2 Six Sigma Statistics
2.2.1 Basic Statistics
2.2.2 Descriptive Statistics
2.2.3 Normal Distributions & Normality
2.2.4 Graphical Analysis
2.2.5 Sampling
2.2.6 Central Limit Theorem
2.3 Measurement System Analysis
2.3.1 Precision & Accuracy
2.4 Process Capability
2.4.1 Capability Analysis
2.4.2 Concept of Stability
2.4.3 Attribute & Discrete Capability
3.0 Analyze Phase
3.3 Hypothesis Testing
3.3.1 General Concepts & Goals of Hypothesis Testing
3.3.2 Significance; Practical vs. Statistical
3.3.3 Risk; Alpha & Beta
3.3.4 Types of Hypothesis Test
3.3.5 Confidence Intervals
3.4 Hypothesis Testing with Normal Data
3.4.1 1 & 2 sample t-tests
3.4.2 1 One Way ANOVA
3.5 Hypothesis Testing with Non-Normal Data
3.5.6 One and Two Sample Proportion
3.5.7 Chi-Squared (Contingency Tables)
4.0 Improve Phase
4.1 Simple Linear Regression
4.1.1 Correlation
4.2 Lean
4.3 Control Methods for 5S
4.4 Kanban
4.5 Poka-Yoke (Mistake Proofing)
4.6 DOE Basics
5.0 Control Phase
5.1 What is Control?
5.2 Statistical Process Control (SPC)
5.2.1 Data Collection for SPC
5.2.2 I-MR Chart
5.2.3 Xbar-R Chart
5.2.4 U Chart
5.2.5 P Chart
5.2.6 NP Chart
5.2.7 Xbar-S Chart
6.0 Closing Phase
6.1 Presenting the project